Livelife45
16-12-17, 22:59
I am a project manager for an asbestos abatement contractor i was stupid when I first started and was exposed to asbestos a couple of times when I could have avoided it.
The first one was after they were finished glovebagging piping insulation, we helped them load out. The issue was it was in a tunnel and it got dusty. It looked like concrete dust but not sure. It took about 2 hours total
The second one was I entered in containment when they were doing terrozo floor removal with trace amount of asbestos but also had to cut into concrete and it was dusty. That was for like 10 minutes
Should I be worried about future issues? I have take precautions now and am avoiding most contact with asbestos especially once our guys are in containment
The first one was after they were finished glovebagging piping insulation, we helped them load out. The issue was it was in a tunnel and it got dusty. It looked like concrete dust but not sure. It took about 2 hours total
The second one was I entered in containment when they were doing terrozo floor removal with trace amount of asbestos but also had to cut into concrete and it was dusty. That was for like 10 minutes
Should I be worried about future issues? I have take precautions now and am avoiding most contact with asbestos especially once our guys are in containment